Chicago Public Schools North Grand High School

MEPIS was commissioned by HPZS to perform upgrades and repairs for the Chemistry lab rooms and to convert one room into a physics classroom. MEPIS Conducted a survey of the Mechanical, Electrical, and Plumbing systems to ensure accuracy. The mechanical scope included design modifications of the fume hood exhaust systems and the BAS systems. Electrical scope consisted of design modifications to branch circuiting, new raceways, outlet locations for data and the replacement of existing outlets and lighting. Plumbing scope included design of new or replacement of sinks and associated supplies, drains, acid basins, and design modifications to lab gas systems.